...
首页> 外文期刊>Power Systems, IEEE Transactions on >Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources
【24h】

Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources

机译:计及间歇性能源的规划输电系统的时间潮流

获取原文
获取原文并翻译 | 示例

摘要

In light of the additional needs imposed by high penetration level of renewable sources on the planning of electric networks, this paper introduces new models and procedures for obtaining more robust and flexible networks. A new methodology, computational algorithm, and a new set of performance indices are presented based on the concept of chronological power flow (CPF). In view of the presence of intermittent energy resources, aspects related to the operation of the system during moments of high energy availability will be duly evaluated, since that is when there might be a waste of renewable energy, and also during low renewable production conditions, when the system may be more fragile. The results obtained for the IEEE Reliability Test System—1996 will also be presented and discussed.
机译:鉴于可再生资源的高渗透水平对电网规划带来的额外需求,本文介绍了用于获得更鲁棒和灵活的电网的新模型和程序。基于时间潮流(CPF)的概念,提出了一种新的方法,计算算法和一组新的性能指标。鉴于存在间歇性能源,将适当评估与高能量可用性时刻有关的系统操作方面,因为那时可能会浪费可再生能源,并且在可再生能源生产较低的情况下,当系统可能更脆弱时。还将介绍和讨论IEEE 1996年可靠性测试系统获得的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号