首页> 外文期刊>Power Systems, IEEE Transactions on >Fault Indicator Deployment in Distribution Systems Considering Available Control and Protection Devices: A Multi-Objective Formulation Approach
【24h】

Fault Indicator Deployment in Distribution Systems Considering Available Control and Protection Devices: A Multi-Objective Formulation Approach

机译:考虑可用控制和保护装置的配电系统故障指示器部署:多目标制定方法

获取原文
获取原文并翻译 | 示例

摘要

This paper introduces a multi-objective fault indicator (FI) placement method in electric distribution systems. The prevalent FI placement problem formulation is extended by considering effects of existing protection and control devices on customers' restoration time. Moreover, the customers' average restoration time index (CARTI) is proposed, as a new technical objective function with respect to uncertainties of automatic switching. Furthermore, a multi-objective solution approach is developed to simultaneously minimize indispensable economic and technical objectives. The resultant optimization problem is solved through a multi-objective particle swarm optimization (MOPSO) based algorithm, accompanied by a fuzzy decision making method to select the best result among the obtained Pareto optimal set of solutions. Assuming SAIDI and CARTI as technical objectives, the proposed method is applied to bus number four of the Roy Billinton test system (RBTS4), as well as a real-life distribution network with about 5500 customers, followed by a discussion on results.
机译:本文介绍了配电系统中多目标故障指示器(FI)的放置方法。考虑到现有保护和控制设备对客户恢复时间的影响,扩展了流行的FI放置问题公式。此外,提出了客户的平均恢复时间指数(CARTI),作为针对自动切换不确定性的新技术目标函数。此外,开发了一种多目标解决方案方法,以同时最小化必不可少的经济和技术目标。通过基于多目标粒子群优化(MOPSO)的算法解决了最终的优化问题,并辅之以模糊决策方法,以从获得的Pareto最优解集中选择最佳结果。假设以SAIDI和CARTI为技术目标,则该方法适用于Roy Billinton测试系统(RBTS4)的4号总线以及具有约5500个客户的实际分销网络,然后讨论结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号