首页> 外文期刊>Power Systems, IEEE Transactions on >Coordination of Generation Maintenance Scheduling in Electricity Markets
【24h】

Coordination of Generation Maintenance Scheduling in Electricity Markets

机译:电力市场中发电维修计划的协调

获取原文
获取原文并翻译 | 示例

摘要

Generation maintenance scheduling (GMS) plays an important role in power system operations. The restructuring of the power industry has forced changes to the traditional maintenance mechanism. On one hand, the generation companies seek to maximize their profit. On the other hand, the independent system operator (ISO) strives to maintain the operational reliability of the system while maximizing the social welfare. This paper proposes a coordination mechanism for generation maintenance scheduling in electricity markets. In order to solve the resulting large mixed integer programming (MIP) problem, a relaxation induced algorithm is utilized. This technique is based on the solution of the linear relaxed problem. The features of the coordination mechanism and the performance of the algorithm are demonstrated using the IEEE-118 bus system and a provincial power system in China. Case studies show that the proposed mechanism not only ensures the maintenance preference of the generating companies, but also maintains the operational reliability of the system. They also demonstrate that the algorithm is quite efficient at solving the optimization problem.
机译:发电维护计划(GMS)在电力系统运行中起着重要作用。电力行业的结构调整迫使传统的维护机制发生了变化。一方面,发电公司寻求最大化其利润。另一方面,独立系统运营商(ISO)努力在保持社会福利最大化的同时,保持系统的运行可靠性。本文提出了电力市场中发电维护调度的协调机制。为了解决由此产生的大混合整数规划(MIP)问题,利用了松弛诱导算法。该技术基于线性松弛问题的解决方案。利用IEEE-118总线系统和中国的省级电力系统,论证了协调机制的特点和算法的性能。案例研究表明,所提出的机制不仅可以确保发电公司的维护偏好,而且可以保持系统的运行可靠性。他们还证明了该算法在解决优化问题方面非常有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号