The power systems operated by the utilities in developing countries suffer from a large gap between demand and generation, inadequate transmission capacity, and nonuniform location of the load centers and generating stations. Occurrences of faults in such systems, in most of the cases, end up with the worst consequences (i.e., complete blackout). This paper illustrates the way a blackout can be prevented in real time through controlled segregation of a system into a number of viable islands together with generation and/or load shedding. The nature and location of any fault that warrants such islanding can be ascertained in real time through monitoring the active-power (megawatt) flows at both ends of a number of prespecified lines. The blackout of June 20, 1998 in the Bangladesh Power Development Board system has been used as an example in the illustration. The philosophy of the proposed islanding scheme may be considered for implementation in other power systems also.
机译:由发展中国家的公用事业运营的电力系统在需求和发电,传输容量不足和负载中心和发电站的不均匀位置之间存在巨大差距。在大多数情况下,在这种系统中发生故障的发生最终(即,完全停电)。本文通过将系统的分离与生成和/或负载脱落在一起,通过将系统的分离进行了实时防止停电的方式。根据许多预定线的两端的两端监测有效功率(兆瓦)流动,可以确定任何故障的性质和位置。 1998年6月20日在孟加拉国电力开发板系统中的停电已被用作图中的示例。拟议的岛屿计划的哲学也可以考虑在其他电力系统中实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号