首页> 外文期刊>IEEE Transactions on Power Systems >Short-term resource scheduling with ramp constraints [power generation scheduling]
【24h】

Short-term resource scheduling with ramp constraints [power generation scheduling]

机译:具有斜坡约束的短期资源调度[发电调度]

获取原文
获取原文并翻译 | 示例

摘要

This paper describes a Lagrangian relaxation-based method to solve the short-term resource scheduling (STRS) problem with ramp constraints. Instead of discretizing the generation levels, the ramp rate constraints are relaxed with the system demand constraints using Lagrange multipliers. Three kinds of ramp constraints, startup, operating and shutdown ramp constraints are considered. The proposed method has been applied to solve the hydro-thermal generation scheduling problem at PG&E. An example alone with numerical results is also presented.
机译:本文介绍了一种基于拉格朗日松弛法的方法,该方法可以解决带有斜坡约束的短期资源调度(STRS)问题。使用Lagrange乘数,通过系统需求约束放宽了斜坡率约束,而不是离散化发电水平。考虑了三种斜坡约束,即启动,运行和关闭斜坡约束。该方法已被应用于解决PG&E水热发电调度问题。还提供了一个单独的示例,并给出了数值结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号