首页> 外文期刊>IEEE Transactions on Power Systems >A practical approach to solve power system constraints with application to the Spanish electricity market
【24h】

A practical approach to solve power system constraints with application to the Spanish electricity market

机译:解决电力系统约束的实用方法,并应用于西班牙电力市场

获取原文
获取原文并翻译 | 示例

摘要

The solution of power system constraints is an important issue that has to be addressed to achieve a fair operation of a competitive electricity market. In the Spanish electricity market, the System Operator (SO) is in charge of determining the technical feasibility of the generation dispatch provided by the Market Operator (MO). An optimal solution method of power system constraints in the Spanish market must take into account the connection of off-line units to solve both branch overloads and voltage constraints, the adjustment of voltage control resources, the solution of the postulated n-1 and n-2 contingencies with a preventive criteria and the coupling of the solution in the 24 hourly scenarios due to the start-up cost of nonconnected units. This paper details the management of power system constraints in the Spanish market, and contains a comprehensive review of solution methods of power system constraints. In addition, the paper proposes a novel approach to solve Spanish power system constraints that overcomes the limitations of existing methods, by decoupling the solution of branch overloads and voltage constraints.
机译:电力系统约束的解决方案是一个重要的问题,必须要实现公平竞争的电力市场。在西班牙电力市场中,系统运营商(SO)负责确定市场运营商(MO)提供的发电调度的技术可行性。西班牙市场中电力系统约束的最佳解决方案方法必须考虑到离线设备的连接,以解决支路过载和电压约束,电压控制资源的调整,假定的n-1和n- 2个带有预防标准的突发事件,以及由于未连接单元的启动成本而导致的24小时方案中的解决方案耦合。本文详细介绍了西班牙市场中电力系统约束的管理,并对电力系统约束的解决方法进行了全面回顾。此外,本文提出了一种解决西班牙电力系统约束的新颖方法,该方法通过将支路过载和电压约束的解决方案解耦,从而克服了现有方法的局限性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号