A pollution control project at the Plant Scherer Power generating station in Juliette, Ga., required ingenuity, experience and knowhow. Not to mention some nifty lifting equipment. The duct work needed to be positioned within a congested area between the bag house and chimney. But there was no room in the area for the size and capabilities needed to use a conventional crane, said Michael Watson, BE&K Construction's Heavy Rigging Superintendent.
展开▼