...
首页> 外文期刊>Port Engineering Management >GeoSea secures two European contracts.
【24h】

GeoSea secures two European contracts.

机译:GeoSea获得了两个欧洲合同。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In Belgium, the works on the Northwind offshore wind farm have started while those from C-Power's third phase are continuing. The DEME Group is utilising various specialised companies from the Group to this end -Tideway Offshore Solutions BV (erosion protection works and cable-laying activities), GEOSEA Geotechnical & Offshore Solutions (foundation works and erection of the wind turbines), and Dredging International Marine & Waterway Solutions NV (general co-ordination and engineering).
机译:在比利时,Northwind海上风电场的工程已经开始,而C-Power第三阶段的工程仍在继续。为此,DEME集团正在利用各种专业公司,包括:Tideway Offshore Solutions BV(防腐蚀工程和电缆铺设活动),GEOSEA Geotechnical&Offshore Solutions(风电的基础工程和安装)以及Dredging International Marine &Waterway Solutions NV(一般协调和工程)。

著录项

  • 来源
    《Port Engineering Management》 |2013年第5期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号