...
首页> 外文期刊>Port Engineering Management >Getting ready for the next generation of offshore wind projects
【24h】

Getting ready for the next generation of offshore wind projects

机译:为下一代海上风项目做好准备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Belgium's Jan De Nul Group has ordered the Voltaire, its third offshore jack-up installation vessel, at China's COSCO Shipping Heavy Industry. With an unrivalled crane capacity of over 3,000 tonnes, this jack-up vessel will be able to support the renewable energy industry to build the future wind farms at sea. The vessel is set to be delivered in 2022. The global offshore wind industry is developing the next generation of offshore wind turbines. These turbines can be more than 270 m high and are fitted with blades of 120 m long. Offshore installation vessels currently available on the market are facing increasing difficulties to install these types of turbines due to the turbines' sizes and installation heights, as well as the ever-increasing foundation dimensions.
机译:比利时的Jan De Nul Group在中国的中远航运重工业中订购了第三艘海上升降机安装船的伏尔泰。这种杰克船只的无与伦比的起重机容量超过3,000吨,将能够支持可再生能源行业,以建立海上的未来风电场。该船将于2022年送达。全球海上风力行业正在开发下一代海上风力涡轮机。这些涡轮机高于270米,刀片长120米。由于涡轮机的尺寸和安装高度以及不断增加的基础尺寸,市场上目前可用的海上安装船只正在面临越来越困难。

著录项

  • 来源
    《Port Engineering Management》 |2019年第2期|29-31|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号