...
首页> 外文期刊>Port Engineering Management >Getting ready for the next generation of offshore wind projects
【24h】

Getting ready for the next generation of offshore wind projects

机译:为下一代海上风能项目做准备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Belgium's Jan De Nul Group has ordered the Voltaire, its third offshore jack-up installation vessel, at China's COSCO Shipping Heavy Industry. With an unrivalled crane capacity of over 3,000 tonnes, this jack-up vessel will be able to support the renewable energy industry to build the future wind farms at sea. The vessel is set to be delivered in 2022. The global offshore wind industry is developing the next generation of offshore wind turbines. These turbines can be more than 270 m high and are fitted with blades of 120 m long. Offshore installation vessels currently available on the market are facing increasing difficulties to install these types of turbines due to the turbines' sizes and installation heights, as well as the ever-increasing foundation dimensions.
机译:比利时的Jan De Nul集团已在中国远洋重工订购了Voltaire,这是其第三艘海上自升式安装船。该自升式起重船拥有超过3,000吨的无与伦比的起重能力,将能够支持可再生能源行业建设未来的海上风电场。该船定于2022年交付。全球海上风电行业正在开发下一代海上风电。这些涡轮机的高度可能超过270 m,并装有120 m长的叶片。由于涡轮机的尺寸和安装高度以及基础尺寸的不断增加,目前市场上可买到的海上安装船面临着越来越大的安装难度。

著录项

  • 来源
    《Port Engineering Management》 |2019年第2期|29-31|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号