首页> 外文期刊>Platts Megawatt Daily >Preliminary work to start soon on gas plant
【24h】

Preliminary work to start soon on gas plant

机译:天然气厂的初步工作即将开始

获取原文
获取原文并翻译 | 示例
       

摘要

Preliminary work will begin this fall on Alliant Energy's 700-MWrncombined-cycle natural gas plant in Wisconsin with major constructionrnstarting in the spring of 2017, an Alliant spokesman said Thursday.rn"There will be pre-construction, site prep and support buildrnactivities going on this fall like a parking lot for construction vehicles,rnlay down yard, infrastructure around the site that will eventually tie-inrnand support the generating station and perhaps even some work on itrnas well," Scott Reigstad said in an email.
机译:Alliant发言人周四表示,Alliant能源公司位于威斯康星州的700 MWrn联合循环天然气工厂的初步工作将于今年秋天开始,主要建设工作将于2017年春季开始。rn“将进行前期施工,现场准备和支持建造活动今年秋天,这就像是建筑车辆的停车场,堆放场,场地周围的基础设施,最终将约束并支持发电站,甚至可能在itrnas上进行一些工作,” Scott Reigstad在一封电子邮件中说。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0715期|9-9|共1页
  • 作者

    Bob Matyi;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:32

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号