Start-up and Initial Operations of the New Coke Plant Wastewater Treatment System at U.S. Steel Gary Works

机译:美国钢铁加里工厂的新焦化厂废水处理系统的启动和初始运行

获取原文
获取原文并翻译 | 示例
           

摘要

U.S. Steel designed, constructed and started a new wastewater system for contaminated flushing liquor treatment at its Coke Operations in Gary, Ind. The plant commenced operation in late 1998 and treats a wastewater flow of 250 gallons per minute from the second largest coke plant in North America. The treatment facility consists of oil/tar separation, equalization, steam distillation for removal of free ammonia and acid gases, and activated sludge nitrification and denitrification. After steam stripping, total nitrogen concentrations of approximately 3000 mg/l are treated in the biological system. Two activated sludge tanks, each with an integral clarifier and anoxic and aerobic zones, accomplish nitrification, denitrification and secondary clarification in a single tank. Excess sludge is dewatered on a belt filter press and recycled (applied on coal for cokemaking).Start-up and operational experience on this unique coke plant wastewater treatment system at Gary proved the design to be capable of rapid start-up, good performance and easy operation.
机译:美国钢铁公司在其位于印第安纳州加里的可乐工厂设计,建造并启动了一个新的废水系统,用于处理受冲洗的冲洗液。该工厂于1998年下半年开始运营,处理了北方第二大焦炭厂每分钟250加仑的废水美国。该处理设施包括油/焦油分离,均衡,蒸汽蒸馏以除去游离的氨和酸性气体,以及活性污泥的硝化和反硝化。汽提后,在生物系统中处理的总氮浓度约为3000 mg / l。两个活性污泥池,每个池都有一个集成的净化器和缺氧和好氧区,可在一个池中完成硝化,反硝化和二次净化。多余的污泥在带式压滤机上脱水并回收(应用于炼焦煤)。在加里,这种独特的炼焦厂废水处理系统的启动和运行经验证明了该设计具有快速启动,良好的性能和可再生性的特点。操作简单。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号