首页> 外文期刊>Platts Megawatt Daily >DTE plans 3,306 MW of coal closures by 2023
【24h】

DTE plans 3,306 MW of coal closures by 2023

机译:DTE计划到2023年关闭3,306兆瓦煤炭

获取原文
获取原文并翻译 | 示例
       

摘要

DTE Energy, which manages an 11,084-MW generating system which isrn55% coal-fired, said Wednesday that it intends over the next sevenrnyears to retire 3,306 MW of coal-fired capacity at 11 units at three of itsrnbest known coal-fired power generating facilities.rnSlated for retirement between now and 2023, are six units withrn1,416-MW of capacity at DTE’s St. Clair facility in East China Township;rn1,350 MW at the firm’s three-unit Trenton facility; and 540 MW at therntwo-unit River Rouge facility on the banks of the Detroit River.
机译:DTE能源公司管理着1108.44兆瓦的发电系统,该系统的燃煤率为55%,该公司周三表示,它计划在未来的七年内,在其最知名的三个燃煤发电设施中的11个单位中淘汰3,306兆瓦的燃煤发电能力。 .rn计划从现在起到2023年退役,有6台DTE位于华东镇St. Clair的工厂,容量为1,416 MW; rn该公司三单元的Trenton工厂的容量为1,350 MW;底特律河沿岸的特尔弗鲁尔河铁水装置的装机容量为540兆瓦。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0609期|2-2|共1页
  • 作者

    Jeffrey Ryser;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:47:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号