...
首页> 外文期刊>Platts Megawatt Daily >Colstrip shutters units 1 and 2 two and a half years earlier than negotiated
【24h】

Colstrip shutters units 1 and 2 two and a half years earlier than negotiated

机译:Colstrip百叶窗单元1和2比谈判提前了两年半

获取原文
获取原文并翻译 | 示例

摘要

Two coal-fired turbines operating since the mid-1970s at the 2,094-MWColstrip power plant in Montana were shut down Sunday, according toplant co-owner and operator Talen Energy.The closures came nearly two-and-a-half years earlier than thelegally mandated deadline to shut down units 1 and 2 imposed by asettlement agreement reached between environmental groups andthe six owners of Colstrip: Talen Energy subsidiary Talen Montana LLC,Puget Sound Energy, Avista, NorthWestern Corp., PacifiCorp andPortland General Electric.
机译:据电厂共同所有者兼运营商塔伦能源公司(Talen Energy)称,自1970年代中期以来,蒙大拿州2,094兆瓦科尔茨trip发电厂运行的两台燃煤涡轮机于周日被关闭。关闭时间比法律上早了近两年半。环保小组与Colstrip的六家所有者达成的清算协议规定的1号和2号机组的法定截止日期为:Talen Energy的子公司Talen Montana LLC,Puget Sound Energy,Avista,Northwestern Corp.,PacifiCorp和Portland General Electric。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号