...
首页> 外文期刊>Platts Energy Trader >Interregional offshore wind power transmission planning needed to hit state goals, say developers
【24h】

Interregional offshore wind power transmission planning needed to hit state goals, say developers

机译:说明开发人员说,区域间海上风力传递规划需要击中州目标

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Interregional transmission planning for US East Coast offshore winddevelopment will be critical to meeting state goals, because after theinitial projects are developed there will be limited capacity foradditional projects to connect to onshore power grids, stakeholdersand developers said Oct. 29.Atlantic Coast states have offshore wind power capacity goals thattotal 37.5 GW between now and 2040, according to a presentationgiven by a group of clean energy advocates during an Inter-RegionalPlanning Stakeholder Advisory Committee meeting.
机译:美国东海岸海上风的区域间传动规划 发展对达到州目标至关重要,因为之后 开发了初始项目将有限 连接到陆上电网,利益相关者的其他项目 和开发商10月29日说。 大西洋沿岸国家有海上风力发电能力目标 根据演示文稿,现在和2040年之间总计37.5 GW 在区域间的一组清洁能源倡导者给出 规划利益攸关方咨询委员会会议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号