VSC-HVDC have become a feasible technology to export the energy from offshore wind power plants, however a technical and economic evaluation must be performed to ensure the viability of the project. In the present work a methodology for the evaluation is presented considering the different available connection options such as Medium Voltage AC, High Voltage AC and VSC-HVDC. This is implemented in the electric software DIgSILENT POWERFACTORY by means of the programming language DPL. The implemented code considers the steady-state losses, the planned/unplanned losses costs and also the investment costs capitalized over the whole project life time in order to obtain the long term economic cost for each of the configurations. The defined procedure has been applied for several cases showing the losses and costs and the break-even point in which VSC-HVDC becomes more cost-effective.
机译:VSC-HVDC已成为从海上风电厂出口能源的可行技术,但必须进行技术和经济评估以确保项目的可行性。在本工作中,考虑到诸如中电压AC,高压AC和VSC-HVDC等不同的可用连接选项,提出了评估的方法。这通过编程语言DPL在电气软件DigSilent PowerFactory中实现。实施的代码考虑了稳态亏损,计划/无计划的损失成本以及投资成本在整个项目生命周期下资本化,以便获得每种配置的长期经济成本。已经应用了定义的程序,用于几个案例,显示损失和成本以及VSC-HVDC变得更具成本效益的突破点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号