首页> 外文期刊>Platts Energy Trader >NYISO adjusts grid planning assumptions to account for aggressive state goals
【24h】

NYISO adjusts grid planning assumptions to account for aggressive state goals

机译:NYISO调整网格规划假设以考虑进取的州目标

获取原文
获取原文并翻译 | 示例
           

摘要

The New York Independent System Operator is considering planningassumptions during a period of considerable power system changes,including 6,000 MW of offshore wind power by 2030, regulations thatcould impact roughly 3,300 MW of generation and an incremental 1,250MW of Canadian hydropower imports.As part of developing NYISO's biannual Congestion Assessmentand Resource Integration Study, which projects congestion on the bulkpower system over a ten-year planning horizon, the grid operator isfactoring in state policies that include generating 70% of New York'selectricity from renewable sources by 2030.
机译:纽约独立系统运营商正在考虑在电力系统发生重大变化的时期内进行规划假设,包括到2030年达到6,000兆瓦的海上风电,可能影响约3,300兆瓦发电量的法规以及增加的1,250 MW加拿大水电进口量。 NYISO的半年度拥堵评估和资源整合研究计划在十年规划期内对大功率电力系统进行拥堵预测,电网运营商正在考虑国家政策,其中包括到2030年从可再生能源中产生70%的纽约电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号