首页> 外文期刊>Power in Europe >United Kingdom in brief...
【24h】

United Kingdom in brief...

机译:英国简述...

获取原文
获取原文并翻译 | 示例
           

摘要

1. DONG Energy is to begin commercial operation of a 421-MW combined cycle unit at Uskmouth, south Wales in October, with a second unit of similar size following in December, the Danish company said September 6. "Unit 10 is expected to be operational in October... the plan is to put it into production as soon as possible," a DONG spokesman said. "Unit 20 is expected to be operational in December."rn2. Vattenfall has completed the 300-MW, 100-turbine Thanet offshore wind farm off the Kent coast, boosting UK offshore capacity by around a third, the company said September 10.
机译:丹麦公司9月6日说,DONG Energy将于10月在南威尔士的Uskmouth开始商业化运行一个421兆瓦的联合循环装置,并于12月启动第二个类似规模的装置。董建华发言人说:“计划于十月投入生产。该计划将尽快投入生产。” “ 20号机组有望在12月投入使用。” rn2。该公司9月10日表示,Vattenfall公司已经完成了在肯特海岸的300兆瓦,100台涡轮机的塞内特海上风力发电场的建设,使英国的海上发电能力提高了约三分之一。

著录项

  • 来源
    《Power in Europe》 |2010年第584期|P.20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号