...
首页> 外文期刊>Electric Utility Week >SPP wins praise and approval for novel plan of grid upgrades based on economic benefits
【24h】

SPP wins praise and approval for novel plan of grid upgrades based on economic benefits

机译:SPP基于经济效益的新型电网升级计划赢得赞誉和认可

获取原文
获取原文并翻译 | 示例
           

摘要

The Southwest Power Pool received federal approval Thursday for an innovative approach to transmission upgrades based on economic rather than reliability benefits. The Federal Energy Regulatory Commission largely accepted the SPP plan, which will use a portfolio approach to grid projects to assure that all zones within the regional transmission organization's territory receive a net benefit from a set of projects. The costs then could be spread region-wide as a "postage stamp" rate rather than burdening one or a few zones with the full cost. "This filing addresses one of the most difficult issues we have to deal with, regional cost allocation," said FERC Chairman Joseph Kelliher at the commission's monthly open meeting. The SPP approach "cuts through the Gordian knot" of objections that arise when attempts are made to spread costs more widely, he said. FERC accepted the structure of the plan and the use of the proposed system of calculating costs and benefits, despite some calls for a revision of that methodology. FERC did require that SPP include third-party impacts in its cost-benefit analyses. Stakeholders filed few requests for changes in the plan.
机译:西南动力库周四获得了联邦政府的批准,其基于经济而非可靠性优势的变速箱升级创新方法。联邦能源监管委员会在很大程度上接受了SPP计划,该计划将对电网项目使用投资组合方法,以确保区域传输组织领土内的所有区域都将从一系列项目中获得净收益。然后可以将这些成本作为“邮票”费率分布到整个地区,而不用负担全部成本的一个或几个区域。 FERC主席约瑟夫·凯利赫(Joseph Kelliher)在委员会的每月公开会议上说:“该文件解决了我们必须处理的最困难的问题之一,即区域成本分配。”他说,SPP方法“打破了戈尔迪式的结”,而这种反对是在试图更广泛地分摊成本时出现的。 FERC接受了计划的结构以及提议的成本和收益计算系统的使用,尽管有人要求修改该方法。 FERC确实要求SPP在其成本效益分析中包括第三方影响。利益相关者很少提出变更计划的请求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号