...
首页> 外文期刊>Electric Utility Week >Kansas regulators to decide who should build big transmission line: Westar or ITC
【24h】

Kansas regulators to decide who should build big transmission line: Westar or ITC

机译:堪萨斯州监管机构决定由谁建造大型输电线路:Westar或ITC

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Kansas Corporation Commission has been asked to determine whether Westar Energy or a subsidiary of ITC Holdings should be permitted to build, own and operate a major transmission project in the state. ITC Great Plains for more than a year has been positioning itself to build a 180-mile, 345-kV line to run from a Sunflower Electric Power substation in Spearville in western Kansas to a Westar substation near Wichita in the central part of the state. Westar, however, Westar, however, is disputing ITC's proposal and wants to build the line itself.
机译:已要求堪萨斯公司委员会确定是否应允许威斯塔能源公司或ITC Holdings的子公司在该州建造,拥有和运营一个大型输电项目。 ITC大平原已经将自己定位为建设一条180英里,345 kV的线路,该线路将从堪萨斯州西部Spearville的向日葵电力变电站延伸到该州中部威奇托附近的Westar变电站。但是,维斯塔(Westar)却在争辩ITC的提议,并希望自己建立这条生产线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号