首页> 外文期刊>NGW's Gas Market Reconnaissance >Prairie Wind Transmission, a joint venture between Westar Energy and Electric Transmission America, filed a siting permit application with the Kansas Corporation Commission today to request permission to build a double circuit 345-kV transmission line.
【24h】

Prairie Wind Transmission, a joint venture between Westar Energy and Electric Transmission America, filed a siting permit application with the Kansas Corporation Commission today to request permission to build a double circuit 345-kV transmission line.

机译:Westar Energy和Electric Transmission America的合资企业Prairie Wind Transmission今天向堪萨斯州委员会提交了选址许可申请,以请求许可建造345 kV双回路输电线路。

获取原文
获取原文并翻译 | 示例
           

摘要

The line would run from Westar Energy's Wichita 345-kV substation, about one mile northeast of Colwich, to a new substation just east of Medicine Lodge, Kansas, and then south to the Kansas-Oklahoma border.
机译:该线路将从Westar Energy的Wichita 345 kV变电站运行,该变电站位于Colwich东北约一英里处,到堪萨斯州Medicine Lodge东部的一个新变电站,然后向南至Kansas-Oklahoma边界。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号