...
首页> 外文期刊>Electric Utility Week >Cal-ISO draft proposal eyes clearing generation interconnection backlog
【24h】

Cal-ISO draft proposal eyes clearing generation interconnection backlog

机译:Cal-ISO提案草案将清除发电互连积压

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The California Independent System Operator Wednesday issued a draft proposal to clear the existing backlog of requests in its generation interconnection process. Cal-ISO said new procedures are needed to handle an unprecedented proliferation of interconnection requests that have overwhelmed available staffing resources, led to delays, and exposed fundamental shortcomings in the pro forma processes created by Federal Energy Regulatory Commission Order 2003, the large generator interconnection process, or LGIP, rule, which uses a serial generation interconnection study approach.
机译:加利福尼亚独立系统运营商周三发布了一项提案草案,以清除其发电互连流程中现有的积压请求。 Cal-ISO表示,需要新的程序来处理前所未有的互连请求激增,这些请求使可用的人力资源不堪重负,导致延迟,并暴露了联邦能源管理委员会命令2003(大型发电机互连过程)创建的备考流程中的根本缺陷。或LGIP规则,它使用串行世代互连研究方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号