首页> 外文期刊>Pipeline & gas journal >What's Ahead For TransportersAnd Marketers of C0_2
【24h】

What's Ahead For TransportersAnd Marketers of C0_2

机译:C0_2的运输商和营销商的未来

获取原文
获取原文并翻译 | 示例
       

摘要

Kinder Morgan's R.Tim Bradley, president of CO_2, discusses the impact the company's new 91-mile, 10-inch CO2 distribution pipeline and complementary facilities will have on future enhanced oil recovery operations in the region and the company's future plans. Kinder Morgan is one of the nation s largest pipeline transportation and energy storage companies with more than 37,000 miles of pipelines and 180 terminals. The company transports, stores and handles energy products like natural gas, refined petroleum products, crude oil, ethanol, coal and carbon dioxide (CO_2. These products are essential for generating electricity, heating homes, powering cars and much more. Kinder Morgan is also the leading transporter and marketer of CO_2 in North America, delivering approximately 1.3 Bcf/d through about 1,300 miles of pipelines. The company ranks as the second-largest oil producer in Texas, producing over 55,000 bpd at the SACROC Unit and the Yates Field in the Permian Basin. In addition to CO_2 pipelines and oil producing fields, this business segment owns significant interests in and operates CO_2 source fields, natural gas and gasoline processing plants, and a crude oil pipeline. According to the company, CO_2 flooding is a proven technology that is used to boost production in mature oilfields. Kinder Morgan transports CO_2 via pipeline from southwestern Colorado to West Texas where it is injected into oil-producing fields. The Permian Basin produces approximately 20% of the total oil production in the United States (excluding Alaska). Shortly after completing construction of the company's CO_2 Eastern Shelf Pipeline and the Katz oil field project in the eastern Permian Basin of Texas, P&GJ visited with R. Tim Bradley, president of CO_2, of Kinder Morgan, to discuss the impact the new 91-mile, 10-inch CO_2 distribution pipeline and complementary facilities will have on future enhanced oil recovery operations in the region and the company's future plans.
机译:金德摩根(Kinder Morgan)CO_2总裁R.Tim Bradley讨论了该公司新的91英里,10英寸CO2分配管道和配套设施将对该地区未来提高采油率的业务以及公司未来计划的影响。金德摩根(Kinder Morgan)是美国最大的管道运输和能源存储公司之一,拥有37,000多英里的管道和180个码头。该公司运输,储存和处理能源产品,例如天然气,精炼石油产品,原油,乙醇,煤炭和二氧化碳(CO_2)。这些产品对于发电,供暖,为汽车提供动力等至关重要。该公司是北美领先的CO_2运输商和销售商,通过约1,300英里的管道输送大约1.3 Bcf / d的石油,是德克萨斯州第二大石油生产商,在SACROC单位和美国耶茨油田的日产量超过55,000 bpd。在二叠纪盆地,除了CO_2管道和石油生产领域外,该业务部门还对CO_2气田,天然气和汽油加工厂以及原油管道拥有重大利益,并经营着该公司。用来提高成熟油田产量的技术金德·摩根(Kinder Morgan)通过管道将CO_2从科罗拉多州西南部运到西德克萨斯州,并在那里注入进入石油生产领域。二叠纪盆地约占美国石油总产量的20%(不包括阿拉斯加)。在完成公司的CO_2东部大陆架管道建设和德克萨斯州二叠纪盆地东部的Katz油田项目建设后不久,P&GJ拜访了Kinder Morgan CO_2总裁R. Tim Bradley,讨论了新91英里的影响,10英寸的CO_2输送管道和配套设施将对该地区未来的采油业务以及该公司的未来计划产生影响。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第6期|p.46-47|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号