首页> 外文期刊>Pipeline & gas journal >Nord Stream Gains Phase II Financing
【24h】

Nord Stream Gains Phase II Financing

机译:Nord Stream获得第二阶段融资

获取原文
获取原文并翻译 | 示例
           

摘要

Nord Stream AG says construction of the Nord Stream Pipeline continues on track. The Nord Stream pipeline project involves two parallel pipelines approximately 1,220-km long that will link Russia and the European Union through the Baltic Sea, providing a transport capacity of some 27.5 bcm/y. Construction of the first gas pipe line was completed in April 2011 with plans to start gas transportation by year-end. Nord Stream AG, together with its shareholders in the consortium, OAO Gazprom, E.ON Ruhrgas AG, BASF SE/ Wintershall Holding GmbH, N.V Nederlandse Gasunie, and GDF SUEZ S.A. announced the successful signing of phase two financing of the pipeline project earlier this year. The project financing for phase two amounts to 2.5 billion euros.
机译:Nord Stream AG说,Nord Stream管道的建设仍在继续。 Nord Stream管道项目涉及两条平行管道,长约1,220公里,将通过波罗的海连接俄罗斯和欧盟,运输能力约为27.5 bcm / y。第一条天然气管道的建设已于2011年4月完成,计划年底前开始天然气运输。 Nord Stream AG及其财团的股东OAO Gazprom,E.ON Ruhrgas AG,​​BASF SE / Wintershall Holding GmbH,NV Nederlandse Gasunie和GDF SUEZ SA宣布在此之前成功签署了该管道项目的第二阶段融资年。第二阶段的项目融资达25亿欧元。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第4期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号