首页> 外文期刊>Pipeline & gas journal >READY OR NOT, Here Comes New U.S. Pipeline Infrastructure
【24h】

READY OR NOT, Here Comes New U.S. Pipeline Infrastructure

机译:准备与否,新的美国管道基础设施来了

获取原文
获取原文并翻译 | 示例
       

摘要

Within the span of less than three days in early November, the construction of the much-embattled Williams Partners LP's Atlantic Sunrise natural gas pipeline project was halted and then restored by an appellate court in Washington, D.C. It is an all-too-familiar part of the developing short history of this 1.7 Bcf/d project. Williams' Transcontinental Gas Pipe Line Co. (Transco) has been bidding for some time to move Marcellus Shale supplies in Pennsylvania to the Gulf Coast, running through Maryland and Virginia on the way to the Gulf.
机译:在11月初不到三天的时间里,备受争议的Williams Partners LP的Atlantic Sunrise天然气管道项目的建设被暂停,然后由华盛顿​​特区的上诉法院恢复。这是一个非常熟悉的部分1.7 Bcf / d项目发展的短暂历史。威廉姆斯(Williams)的跨大陆天然气管道公司(Transco)一直在竞标一段时间,将宾夕法尼亚州的马塞勒斯页岩物资运送到墨西哥湾沿岸,并途经马里兰州和弗吉尼亚州,然后再到达墨西哥湾。

著录项

  • 来源
    《Pipeline & gas journal》 |2018年第1期|18-22|共5页
  • 作者

    Richard Nemec;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:16:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号