首页> 外文期刊>Pipe line & gas industry >Contracting strategy delivers cost-effective Gemini flowlines
【24h】

Contracting strategy delivers cost-effective Gemini flowlines

机译:签约策略提供了经济高效的Gemini流水线

获取原文
获取原文并翻译 | 示例
           

摘要

Dual 12.75-in. OD flowlines extending some 27 mi were installed in the Gulf of Mexico within the bounds of a tight cost and time budget. The Gemini Project team attributes its success to the embrace of the philosophy that good contracting strategy, proper installation planning and good risk management will produce desired results. This article describes the contracting philosophy and management, installation planning and project execution associated with the installation of the Gemini flowlines. The dual Gemini flowlines are 27 mi in length and installed to a maximum water depth of 3,400 ft.
机译:双12.75英寸在紧张的成本和时间预算范围内,在墨西哥湾安装了OD流线,延伸了大约27英里。双子座项目团队的成功归功于良好的合同战略,适当的安装计划和良好的风险管理将产生预期结果的理念。本文介绍了与Gemini流水线的安装相关的承包理念和管理,安装计划以及项目执行。双子座双出水管长27英里,安装时最大水深为3,400英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号