...
首页> 外文期刊>Oil express >Sunoco Joins Others, Nixes Refinery Projects
【24h】

Sunoco Joins Others, Nixes Refinery Projects

机译:Sunoco与其他公司一起,尼克斯炼油厂项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Sunoco has decided to not proceed with a previously announced distillate hydrotreater project at the Tulsa refinery, Terence Delaney, vice president of investor relations and planning, said during an earnings conference call. By eliminating this project, the company's capital spending for 2009 will drop by about $375 million. Sunoco had announced at the end of March that a hydrotreater would be needed to produce ultra-low-sulfur diesel. Expected completion date of the project was 2010.
机译:投资者关系和计划部副总裁特伦斯·德莱尼(Terence Delaney)在财报电话会议上表示,Sunoco决定不再进行先前宣布的塔尔萨炼油厂馏出物加氢处理项目。通过取消该项目,该公司2009年的资本支出将减少约3.75亿美元。 Sunoco于3月底宣布,将需要加氢处理机来生产超低硫柴油。该项目的预计完成日期是2010年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号