首页> 外文期刊>Offshore >Proposed rule seeks stricter well control regulations
【24h】

Proposed rule seeks stricter well control regulations

机译:拟议规则寻求更严格的井控规定

获取原文
获取原文并翻译 | 示例
           

摘要

On April 17, 2015, the Bureau of Safety and Environmental Enforcement (BSEE) announced its new proposed BOP and well control requirements rule for the outer continental shelf federal waters, 30 C.F.R. Part 250. Several years in the making, it aims to enhance well control and equipment reliability, and includes a suite of reforms in well design, well control, casing, cementing, real-time well monitoring, and subsea containment "While we have current requirements related to well control, BOP equipment, and well control equipment, this represents a major upgrade in existing regulations," BSEE's Chief of Offshore Regulatory Programs Doug Morris told Offshore.
机译:2015年4月17日,安全与环境执法局(BSEE)宣布了新的拟议的BOP和井控要求规则,该规则适用于30 C.F.R.以外的大陆架联邦水域。第250部分。开发过程中的几年时间旨在提高油井控制和设备可靠性,并包括油井设计,油井控制,套管,固井,实时油井监控和海底围堵方面的一系列改革。与井控,防喷器设备和井控设备有关的要求,这是对现有法规的重大升级。” BSEE海上监管计划负责人道格·莫里斯(Doug Morris)表示。

著录项

  • 来源
    《Offshore》 |2016年第2期|43-44|共2页
  • 作者

    Sarah Parker Musarra;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号