Equipment and tooling evolve to meet the challenges of subsea field decommissioning

机译:设备和工具不断发展,以应对海底油田退役的挑战

获取原文
获取原文并翻译 | 示例

摘要

Reflecting on the success of these decom­missioning campaigns has raised some ideas worth contemplation. Given the improvements to ROV functionality and tooling, is there a cost-savings benefit to the use of flanges in­stead of more expensive alternatives? Will a few hours of vessel time spent torqueing bolts make more sense than the price of a more sophisticated option? These questions can only be answered through a detailed front-end engineering and design study, as every project is different. Moreover, when a project team is faced with old, outdated technology, it is still possible to provide a modern approach to proj­ect engineering and planning. This requires a "start again" strategy that applies to the design of new equipment and especially to the writing of new procedures. A realistic, physical SIT is ultimately the best way to refine procedural methodology and to identify potential issues with newly designed equipment. Subsea field decommissioning projects will be laden with unknowns, but fortunately you do not have to be an astronaut to get to the bottom of it.
机译:对这些退役运动的成功进行反思,提出了一些值得深思的想法。考虑到ROV功能和工具的改进,使用法兰代替使用更昂贵的替代品是否能节省成本?花费数小时的时间花费在拧紧螺栓上的时间是否比更复杂的选件的价格更有意义?这些问题只能通过详细的前端工程和设计研究来回答,因为每个项目都是不同的。而且,当项目团队面对过时的过时技术时,仍然有可能提供一种现代的方法来投影工程和规划。这需要适用于新设备设计,尤其是新程序编写的“重新启动”策略。实际的物理SIT最终是完善过程方法并识别新设计设备潜在问题的最佳方法。海底野外退役项目将充满未知数,但是幸运的是,您不必成为一名宇航员就可以深入研究该项目。

著录项

  • 来源
    《Offshore 》 |2017年第4期| 58-60| 共3页
  • 作者单位

    UniversalPegasus International;

    UniversalPegasus International;

    UniversalPegasus International;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号