...
首页> 外文期刊>Nucleonics week >Halt of JEA sale likely to result in rate hike for Vogtle costs: expert
【24h】

Halt of JEA sale likely to result in rate hike for Vogtle costs: expert

机译:专家认为,停止出售JEA可能会导致加息

获取原文
获取原文并翻译 | 示例
           

摘要

JEA’s Christmas Eve vote to end efforts to sell the municipal utility islikely to result in increased electric rates for consumers to cover theJacksonville, Florida-based utility’s 200-MW share of the 2.2-GW Vogtlenuclear plant expansion cost overruns, a power market industry expertsaid.JEA’s board of directors on December 24 voted unanimously tostop its “invitation to negotiate” process designed to sell its municipalutilities, mainly electric, to either a private entity or an electriccooperative.
机译:JEA在圣诞节前夕投票结束了出售市政公用事业的努力,这有可能导致提高消费者的电价,以覆盖佛罗里达州杰克逊维尔市的公用事业公司2.2兆瓦Vogtlenuclear工厂扩建成本超支的200兆瓦份额,这是电力市场行业专家的援助。 JEA董事会于12月24日一致投票决定停止“邀请谈判”程序,该程序旨在将其市政公用事业(主要是电力)出售给私人实体或电力合作社。

著录项

  • 来源
    《Nucleonics week》 |2020年第1期|4-5|共2页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号