首页> 外文期刊>Nuclear news >CB&I still studying deviation, QA
【24h】

CB&I still studying deviation, QA

机译:CB&I仍在研究偏差,质量检查

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

On March 20, Chicago Bridge & Iron (CB&I) submitted three updated interim reports on deviations (but, as the company insists, not defects) in work for the Westinghouse Electric Company AP1000 pressurized water reactors being built at the Summer site in South Carolina and the Vogtle site in Georgia. In its reports to the Nuclear Regulatory Commission, CB&I stated that the reports are not final because of the need for review, inspection, and testing. The company's target dates for final reports are given in parentheses at the end of the items listed below: Mechanical coupler welds on overlay plates at Vogtle. The couplers are to provide attachment locations for threaded rebar. The plates were received from the SMCI Division of MetalTek International. There have been instances of weld undersize and incomplete weld fusion. (June 30).
机译:3月20日,Chicago Bridge&Iron(CB&I)提交了三份更新的中期报告,内容涉及在南卡罗来纳州萨默特州夏季工厂建造的西屋电气公司AP1000压水堆的工作偏差(但是,公司坚持认为不是缺陷)。佐治亚州的Vogtle网站。 CB&I在给核监管委员会的报告中指出,由于需要进行审查,检查和测试,因此报告并非最终报告。该公司最终报告的目标日期在下列项目末尾的括号中给出:Vogtle覆盖板上的机械耦合器焊缝。接头应为螺纹钢筋提供连接位置。这些板是从MetalTek International的SMCI部门收到的。出现焊缝尺寸过小和焊缝融合不完全的情况。 (6月30日)。

著录项

  • 来源
    《Nuclear news》 |2015年第6期|68-70|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号