...
首页> 外文期刊>Nuclear news >Waste Management Briefs
【24h】

Waste Management Briefs

机译:废物管理摘要

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The management of hanford's water treatment facilities has been transferred from CH2M Hill Plateau Remediation Company, the contractor for the Department of Energy's Richland Office, to Washington River Protection Solutions (WRPS), the Hanford tank operations contractor for the DOE's Office of River Protection (ORP), the DOE announced on March 31. According to the DOE, the transfer will support current waste tank farm operations and the future operation of the Waste Treatment and Immobilization Plant by aligning work between the Richland Office and ORP. WRPS will manage and operate the Effluent Treatment Facility, the Liquid Effluent Retention Facility, and the Treated Effluent Disposal Facility in Hanford's 200-East Area. The existing staff of about 45 employees was transferred from CH2M Hill to WRPS as part of the facility transition, according to the DOE. In operation for 20 years, the Effluent Treatment Facility treats water contaminated with low levels of radioactive and chemical waste primarily from the 242-A waste tank evaporator, groundwater treatment systems, waste disposal operations, and Hanford's K Basins.
机译:汉福德的水处理设施的管理已从能源部Richland办公室的承包商CH2M Hill Plateau Remediation Company移交给了DOE河流保护办公室(ORP)的Hanford储罐运营承包商Washington Washington Protection Solutions(WRPS)。 ),能源部于3月31日宣布。根据能源部的说法,该转让将通过调整Richland办事处与ORP之间的工作来支持当前的废物罐场运营以及废物处理和固定化工厂的未来运营。 WRPS将在汉福德市200-East地区管理和运营污水处理设施,液体污水保留设施和已处理污水处理设施。根据能源部的说法,现有约45名员工从CH2M Hill转移到WRPS,作为工厂过渡的一部分。废水处理设施已经运行了20年,主要处理242-A废物箱蒸发器,地下水处理系统,废物处理业务以及汉福德K盆地等被少量放射性和化学废物污染的水。

著录项

  • 来源
    《Nuclear news》 |2015年第6期|50-50|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号