...
首页> 外文期刊>The nuclear review >Peninsula Energy Advances Low-pH Testing at Lance Projects
【24h】

Peninsula Energy Advances Low-pH Testing at Lance Projects

机译:半岛能量在Lance项目中推进低pH测试

获取原文
获取原文并翻译 | 示例
           

摘要

During the latest quarter ended September 30, ASX-listed Peninsula Energy commenced the MU1A low-pH field demonstration to operationally verify optimized process chemistry, ion exchange resins, and solids handling method at its Lance Projects in the US State of Wyoming.In a quarterly activities reportreleased this week, the company also noted that field demonstration is progressing as planned to date, with initial results expected during the December quarter. The company said that a binding purchase agreement to procure 400,000 pounds U_3O_8 underpins its forecast net cash margin of US$6-8 million on uranium sales for Calendar Year 2021. Available cash as of September 30 totaled $9.4 million and Peninsula said it is well funded to advance Lance toward a low-capital resumption of production.
机译:在最新季度截止9月30日,ASX列出的半岛能量开始MU1A低pH场地演示,在美国怀俄明州的矛队项目中运行优化的过程化学,离子交换树脂和固体处理方法。本周季度活动报告,本公司还指出,现场示范正在按计划进行,预计12月季度期间预期的初步结果。该公司表示,拟订采购协议促进400,000磅U_3O_8的预测净现金利润率为6-800万美元的日历年份铀销售额。截至9月30日的可用现金总额为940万美元,半岛表示,它得到了很好的资金推进朝向低资本恢复生产的推动。

著录项

  • 来源
    《The nuclear review》 |2020年第23期|57|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号