首页> 外文期刊>Nuclear Engineering International >History of the South African PBMR project
【24h】

History of the South African PBMR project

机译:南非PBMR项目的历史

获取原文
获取原文并翻译 | 示例
           

摘要

High temperature pebble-bed gas-cooled reactors have been under development in Germany, primarily through the German government's Jiilich research centre, since the 1950s. A prototype plant at )ulich, AVR, which produced 15MW of electrical power, operated from 1967-88. This was followed up by a demonstration plant, THTR-300 (300MW), which went critical in 1983. It last generated power in 1988 after numerous technical problems had been encountered and was formally closed in 1989. The AVR was generally portrayed as highly successful and later design concepts were based on the AVR rather than the THTR. Subsequently, the THTR-300 designer, ABB, joined forces with Siemens, which had also designed a similar size plant producing a new design. The joint venture company, HTR, now owned by Areva NP and Toshiba/Westinghouse following various mergers and takeovers, promoted this design for a couple of years before giving up active promotion of it although continuing to sell technology licenses.rnThe HTR design was taken up by South Africa in 1993 by the publicly-owned electric utility, Eskom. HTR cooperated with Eskom who produced a design which, unlike its predecessors, was expected to generate electricity using a gas turbine driven directly by the helium coolant gas rather than via a heat exchanger and a conventional steam circuit. In 1998, these efforts were made public and Eskom then forecast that following completion and operation of a demonstration plant, commercial orders would be possible from 2004 onwards. The electrical output has been uprated from 110MW in 1998 to 165MW.
机译:自1950年代以来,高温卵石床气冷堆一直在德国开发,主要通过德国政府的吉利希研究中心进行。 1967-88年,AVR的原型工厂AVR生产了15MW的电力。随后是示范工厂THTR-300(300MW),该工厂于1983年投入使用。在遇到许多技术问题后,该工厂最后一次发电是在1988年,并于1989年正式关闭。AVR通常被描述为非常成功后来的设计概念是基于AVR而不是THTR。随后,THTR-300的设计师ABB与西门子合作,西门子还设计了一个类似规模的工厂,并进行了新设计。经过各种合并和收购,现在由阿海珐NP和东芝/西屋公司共同拥有的合资公司HTR对该设计进行了几年的推广,然后尽管继续出售技术许可,但放弃了积极的推广。rn由南非的公共电力公司Eskom于1993年提出。 HTR与Eskom合作,后者设计出的产品与之前的产品不同,预计将使用直接由氦冷却剂气体驱动的燃气轮机发电,而不是通过热交换器和传统的蒸汽回路发电。 1998年,这些努力公开了,然后Eskom预测,在示范工厂建成并投入运营后,从2004年起将有可能获得商业订单。电力输出已从1998年的110MW提高到165MW。

著录项

  • 来源
    《Nuclear Engineering International》 |2009年第656期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号