首页> 外文期刊>Nuclear future >Demonstration of optimisation of the disposal facility at Drigg
【24h】

Demonstration of optimisation of the disposal facility at Drigg

机译:演示了Drigg处置设施的优化

获取原文
获取原文并翻译 | 示例
       

摘要

The development concept of the Drigg site from the commencement of disposal operations in 1959 through to the present day has been continually updated to ensure compliance with best practice. It may be concluded that, based on current site understanding, continued development as specified in the current site development plan [Ref.10] is an appropriate solution for the optimum management of the long-term risks and associated uncertainties for the site. This is despite the risk target exceedences associated with historic disposals to the trenches. The further analysis of site risk/impact associated with specific management options, considered together with the removal of key pessimisms and an improved understanding of the key uncertainties, would support the progression of appropriate future management options for the disposal of LLW and for the Drigg site. Future inventory control, although important, will have a small overall effect on site impacts.
机译:从1959年开始处置业务到今天,Drigg基地的开发理念一直在不断更新,以确保遵守最佳实践。可以得出的结论是,基于对当前站点的了解,按照当前站点开发计划[Ref.10]的规定进行持续开发是对站点的长期风险和相关不确定性进行最佳管理的合适解决方案。尽管存在与历史性弃置沟渠有关的风险目标超标的情况,但这仍是可行的。与特定管理选项相关的场地风险/影响的进一步分析,以及消除关键的悲观主义和对关键不确定性的更好理解,将为未来处理低放废物和Drigg场地的适当管理方法的发展提供支持。未来的库存控制虽然很重要,但对现场影响的总体影响较小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号