首页> 外文期刊>Nuclear future >Goliath crane built for Sellafield retrievals
【24h】

Goliath crane built for Sellafield retrievals

机译:用于Sellafield取物的Goliath起重机

获取原文
获取原文并翻译 | 示例
           

摘要

Sellafield Ltd has taken an important step towards retrieving waste from a 60-year-old nuclear waste storage silo, now that a mammoth Semi Goliath crane has been installed.The crane is an integral part of a new Waste Retrieval Facility (WRF) being built alongside the Pile Fuel Cladding Silo (PFCS) and will be used to lift 3m~3 legacy nuclear waste packages onto road transporters.The PFCS was built in 1951 to store radioactive fuel cladding from the military Windscale Piles and later from Calder Hall and Chapelcross reactors. It's effectively a giant concrete safe which has reached the end of its life and extreme safe-breaking skills are going to be used to break through the thick concrete walls and remove the radioactive waste. The WRF is made up of a giant concrete superstructure, into which bespoke waste retrieval modules will be slotted. These will dock onto the side of the PFCS to retrieve the waste through specially-designed silo doors.
机译:Sellafield Ltd已迈出了重要的一步,从已使用60年的核废料储存仓中回收废料,这已经安装了猛Semi的Semi Goliath起重机,该起重机是正在建造的新废物回收设施(WRF)的组成部分PFCS建于1951年,用于存储军用风鳞桩以及后来的Calder Hall和Chapelcross反应堆的放射性燃料包层。它实际上是一个使用寿命已尽的巨型混凝土保险柜,将使用极端的保险柜破坏技术来突破厚的混凝土墙并清除放射性废物。 WRF由巨大的混凝土上部结构组成,定制的废物回收模块将插入其中。这些将停靠在PFCS的侧面,以通过专门设计的料仓门回收废物。

著录项

  • 来源
    《Nuclear future》 |2013年第3期|20-20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号