首页> 外文期刊>Naval engineers journal >Enabling CAIV through Design, Modularity, and Program Management
【24h】

Enabling CAIV through Design, Modularity, and Program Management

机译:通过设计,模块化和程序管理实现CAIV

获取原文
获取原文并翻译 | 示例
       

摘要

Many naval ship acquisition programs have not been able to effectively implement cost as an independent variable (CAIV). With a CAIV approach, operational requirements provided by the customer are given in terms of threshold and objective values. The range between these two values provides the program manager with trade-space to match the available funds with the capabilities that can be bought for that amount-the total program cost remains a constant. In practice though, much of the final cost of an acquisition program is fixed early in the design process through basic design decisions on architecture and the allocation of operational requirements and derived requirements to systems. Unfortunately, while much of the cost is determined early in the design process, estimating that cost to any degree of certainty is nearly impossible. As the costs of the program are better understood, the remaining design flexibility to adjust to increasing costs may not be sufficient to enable the program manager time to take corrective action when the cost estimates indicate a possible problem. This paper describes the techniques, including the use of modularity, cost contingencies, and set-based design, to provide the program manager with sufficient flexibility to implement CAIV. The views expressed in this paper are those of the author and are not necessarily official policy of the US Navy or any other organization. The intent of this paper is to foster dialogue to gain a better understanding of how to develop an acquisition strategy and systems engineering strategy to enable CAIV.
机译:许多海军舰艇采购计划无法有效地将成本作为自变量(CAIV)实施。使用CAIV方法时,将根据阈值和目标值给出客户提供的操作要求。这两个值之间的范围为计划经理提供了交易空间,以使可用资金与可以购买的该金额的能力相匹配-计划总费用保持不变。但是实际上,购置程序的大部分最终成本是在设计过程的早期通过对体系结构的基本设计决策以及对系统的操作需求和派生需求的分配而确定的。不幸的是,尽管大部分成本是在设计过程的早期确定的,但要想在某种程度上确定该成本几乎是不可能的。随着对程序成本的更好理解,当成本估算表明可能存在问题时,为适应不断增加的成本而进行调整的剩余设计灵活性可能不足以使程序经理有时间采取纠正措施。本文介绍了这些技术,包括使用模块化,成本突发事件和基于集合的设计,以为计划经理提供足够的灵活性来实施CAIV。本文中表达的观点仅为作者的观点,不一定是美国海军或任何其他组织的官方政策。本文的目的是促进对话,以更好地了解如何制定购置策略和系统工程策略以启用CAIV。

著录项

  • 来源
    《Naval engineers journal》 |2009年第1期|59-68|共10页
  • 作者

    Norbert Doerry;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:44:08

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号