...
首页> 外文期刊>Modern Railways >BALFOUR BEATTY FOR DUNDEE STATION REVAMP
【24h】

BALFOUR BEATTY FOR DUNDEE STATION REVAMP

机译:邓迪站改造的Balfour Beatty

获取原文
获取原文并翻译 | 示例
           

摘要

The contract for major redevelopment of Dundee station is set to be awarded to Balfour Beatty. The company's £28 million bid was the lowest cost tender for the project and received a higher quality score than a competing bid from BAM. Four companies were originally invited to tender from the work, but two subsequently withdrew. The initial bids from both BAM and Balfour Beatty, received in March this year, did not comply with the contract specification, and so both companies were asked to resubmit. The report to Dundee City Council's Policy and Resources committee noted that'the limited number of contractors tendering has had a considerable effect on the overall tender price', which is £7 million higher than the pre-tender estimate by consultant Jacobs.
机译:邓迪车站的大型改建合同将授予巴尔弗·比蒂。该公司2800万英镑的竞标价格是该项目成本最低的,与BAM的竞标相比,其质量得分更高。最初邀请了四家公司从工作中招标,但随后两家退出了。 BAM和Balfour Beatty的初始投标书于今年3月收到,均不符合合同规定,因此,两家公司均被要求重新提交。邓迪市议会政策与资源委员会的报告指出,“承包商招标数量有限,对总体招标价格产生了相当大的影响”,比顾问雅各布斯(Jacobs)的预估价高出700万英镑。

著录项

  • 来源
    《Modern Railways》 |2015年第805期|22-22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号