JUNGLE BRIDGE

机译:丛林桥

获取原文
获取原文并翻译 | 示例
       

摘要

In learning and developing solutions for the project, the team judged that there were three major problems to overcome. The first was the remoteness of the site. Travel to the site required a five-mile hike up into the mountains, and all needed tools and equipment were hand carried to the site. This requirement drove many design decisions. The second was a communication issue, since the team spoke mostly English with little Spanish, and the locals spoke mostly Q'eqchi' with little Spanish. The third difficulty was the steepness of the east river bank and presence of solid rock under the topsoil. This was turned into an advantage by anchoring the cable into the bedrock.
机译:在学习和开发项目解决方案时,团队认为需要克服三个主要问题。首先是站点的偏僻。前往现场需要步行五英里才能入山,所有必需的工具和设备都随身携带到现场。该要求推动了许多设计决策。第二个是沟通问题,因为该团队主要讲英语,很少讲西班牙语,而当地人则主要讲Q'eqchi',很少讲西班牙语。第三个困难是东河岸陡峭和表土下存在坚硬岩石。通过将电缆锚定到基岩中,这变成了一个优势。

著录项

  • 来源
    《Midwest engineer》 |2009年第2期|9-13|共5页
  • 作者

    Robert Geiger;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:10:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号