首页> 外文期刊>HSB International >Damen launches second frigate for the Royal Moroccon Nauy
【24h】

Damen launches second frigate for the Royal Moroccon Nauy

机译:达门为摩洛哥皇家海军发射第二艘护卫舰

获取原文
获取原文并翻译 | 示例
       

摘要

In early February, the impressive launch of the second multi-mission frigate under construction for the Royal Moroccan Navy took place at Damen Schelde Naval Shipbuilding in Flushing-East. Heavy lift and transport company Mammoet Europe B.V used their unique direct launch' method and rolled the 98 metre long vessel out of the land-based assembly hall to Damen's RoRo quay, where it was placed on a pontoon. During high tide, the pontoon was taken to deeper water to allow the frigate to float free. The 1700 tons weighing vessel was then towed to the Flushing-City shipyard where it will be completed. Delivery of the second frigate is planned for spring 2012. The second frigate joined the first, with 105 metres and at 2000 tons slightly larger frigate in Flushing-City for final outfitting. This first frigate was launched in July 2010 and is due to be completed to be end of 2011. Damen Schelde Naval Shipbuilding also has a third multi-mission frigate for the Royal Moroccan Navy under construction. This vessel, also 98 metres long, is scheduled to be launched in the same way in October 2011.
机译:2月初,为摩洛哥皇家海军建造的第二艘多用途护卫舰令人印象深刻的发射在法拉盛东部的达门·谢尔德海军造船厂举行。重型起重运输公司Mammoet Europe B.V使用他们独特的直接发射方法,将这艘98米长的船只从陆基集会大厅驶出,到达了达门的RoRo码头,并将其放置在浮桥上。在涨潮时,浮船被带到更深的水中,以使护卫舰自由漂浮。然后将1700吨的称量船拖到法拉盛市造船厂,在那里完成建造。第二艘护卫舰计划于2012年春季交付。第二艘护卫舰与第一艘护卫舰相距105米,重达2000吨,在法拉盛市有稍大的护卫舰,以便进行最终装备。这艘第一艘护卫舰于2010年7月发射升空,预计将于2011年底完成。达门·舍尔德海军造船厂还为在建的摩洛哥皇家海军提供了第三艘多用途护卫舰。该船长98米,计划于2011年10月以同样的方式下水。

著录项

  • 来源
    《HSB International》 |2011年第2期|p.24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号