...
首页> 外文期刊>LNG world shipping >Petronas fast-tracks offshore LNG
【24h】

Petronas fast-tracks offshore LNG

机译:马来西亚国家石油公司快速跟踪海上液化天然气

获取原文
获取原文并翻译 | 示例

摘要

Although Shell's Prelude floating LNG production vessel was the first to be contracted, in May 2011, Petronas could well have two FLNG projects underway in Malaysian waters before Prelude processes its first gas. The Malaysian state oil and gas firm gave the approval for the country's first floating LNG production project, to be known as Petronas floating LNG 1 (PFLNG1), in June 2012 and immediately awarded the scheme's US$2 billion engineering, procurement, construction, installation and commissioning (EPCIC) contract to Technip and Daewoo Shipbuilding &. Marine Engineering (DSME). Malaysia is planning on a late 2015 start for this project.
机译:尽管壳牌公司的Prelude浮动液化天然气生产船是第一个签订合同的合同,但在2011年5月,马来西亚国家石油公司很可能在Prelude处理其第一批天然气之前,在马来西亚水域进行两个FLNG项目。马来西亚国家石油和天然气公司于2012年6月批准了该国的第一个浮动LNG生产项目,即马来西亚国家石油公司浮动LNG 1(PFLNG1),并立即授予该计划20亿美元的工程,采购,建筑,安装和与Technip和Daewoo Shipbuilding&签订委托(EPCIC)合同。轮机工程(DSME)。马来西亚计划在2015年下半年开始该项目。

著录项

  • 来源
    《LNG world shipping》 |2012年第6suppla期|10-11|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号