首页> 外文期刊>JSME International Journal. Series C, Mechanical Systems, Machine Elements and Manufacturing >Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel
【24h】

Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

机译:将TOC项目管理应用于研究船的运维计划

获取原文
获取原文并翻译 | 示例
           

摘要

Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
机译:海洋研究船及其系统是海洋资源开发的主要资产。由于船舶的运行成本非常高,因此有必要通过有效的调度操作和维护来降低总成本。为了缩短项目周期并使其高效,我们应用了TOC项目管理方法,这是Eli Goldratt博士开发的一种项目管理方法。它对传统的项目管理方法提出了挑战。自PERT和关键路径方法的发展以来,它将成为项目管理中最重要的改进。作为案例研究,我们介绍了用于运营目的的海洋地质研究项目,以及维修船坞的维修码头项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号