Schedule of supply chain management project based on TOC

机译:基于TOC的供应链管理项目进度

获取原文
获取原文并翻译 | 示例
           

摘要

Firms are being increasingly pressured under the current marketing environment, the uncertainty and risks has greatly influenced the Supply Chain Management project implementation. In this paper, we present a new buffer sizing method that takes into consideration the activity duration risk as well as the multi-resource constraint risk under uncertainty. First of all, the key risk factors are identified and the SCM activity duration risk is effectively assessed by using the Bayesian Network. Secondly, the resource constraint risk is appropriately determined by using the resource flow network. The, a reasonable buffer sizing method is developed for the construction of a stable critical chain scheduling plan. A numerical example and comparative study validate the effectiveness and practicability of the proposed method, which is capable of maintaining the schedule stability with a short project makespan, while ensuring a high on-time completion rate.
机译:公司在目前的营销环境下越来越受到压力,不确定性和风险极大地影响了供应链管理项目实施。 在本文中,我们提出了一种新的缓冲器大小化方法,考虑了活动持续时间风险以及在不确定性下的多资源约束风险。 首先,确定了关键风险因素,通过使用贝叶斯网络有效地评估了SCM活动持续时间风险。 其次,通过使用资源流网络适当地确定资源约束风险。 该方法是开发了合理的缓冲尺寸尺寸的方法,用于构建稳定的关键链调度计划。 数值示例和比较研究验证了所提出的方法的有效性和实用性,该方法能够与短项目Mapspan保持调度稳定性,同时确保高度准时完成速率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号