...
首页> 外文期刊>Journal of Wuhan University of Technology >On the decomposition of alite in portland cement clinker
【24h】

On the decomposition of alite in portland cement clinker

机译:硅酸盐水泥熟料中阿利特石的分解

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The decomposition speed and mechanism of alite in Portland cement clinker are studied by means of op- tical microscopy, EPMA, XRD and chemical analysis. The results show that alite in portland cement clinker decompos- es at the maximum speed when the temperature is at 1025 ~1175 deg.c. It takes about 40 hours for the alite in clinker burnt in the rotary kiln to completely decompose at 1175 C, and about 68 hours for the alite burnt in RSP-kiln. The Presence of CaF_2 or CaSO_4 greatly affects the decomposi- Tion speed of alite. The former resists alite to decompose but The latter accelerates it and enables alite to decompose com- Pletely within 6 hours or less.
机译:利用光学显微镜,EPMA,XRD和化学分析方法研究了硅酸盐水泥熟料中阿利特石的分解速度和机理。结果表明,当温度在1025〜1175℃时,硅酸盐水泥熟料中的珍珠岩分解速度最大。在回转窑中烧成的熟料在1175℃下完全分解大约需要40小时,而在RSP窑中烧成的熟料大约需要68小时。 CaF_2或​​CaSO_4的存在极大地影响了alite的分解速度。前者可以阻止alite分解,而后者可以加速分解,并使alite可以在6小时或更短的时间内完全分解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号