...
首页> 外文期刊>Journal of structural engineering >Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other Paradigms
【24h】

Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other Paradigms

机译:预应力箱形梁的长期挠度过大。 I:帕劳的纪录跨度桥和其他范例

获取原文
获取原文并翻译 | 示例
           

摘要

The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had a record span of 241 m (791 ft), presents a striking paradigm of serviceability loss because of excessive multidecade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, this girder developed a midspan deflection of 1.61 m (5.3 ft) compared with the design camber after 18 years, and it collapsed in 1996 as a consequence of remedial prestressing, after a 3-month delay. Compared with three-dimensional analysis, the traditional beam-type analysis of box girder deflections is found to have errors up to 20%, although greater errors are likely for bridges with higher box-width-to-span ratios than the KB Bridge. However, even three-dimensional finite-element analysis with step-by-step time integration cannot explain the observed deflections when the current American Concrete Institute, Japan Society of Civil Engineers, Comite Euro-International du Beton (or Comite Euro-International du Beton-Federation internationale de la precontrainte), and Gardner and Lockman prediction models for creep and shrinkage are used. These models give 18-year deflection estimates that are 50-77% lower than measured and yield unrealistic shapes of the deflection history. They also predict the 18-year prestress loss to be 46-56% lower than the measured mean prestress loss, which was 50%. Model B3, which is the only theoretically based model, underestimates the 18-year deflection by 42% and gives a prestress loss of 40% when the default parameter values are used. However, in Model B3, several input parameters are adjustable and if they are adjusted according to the long-time laboratory tests of Brooks, a close fit of all the measurements is obtained. For early deflections and their extrapolation, it is important that Model B3 can capture realistically the differences in the rates of shrinkage and drying creep caused by the differences in the thickness of the walls of the cross section. The differences in temperature and possible cracking of the top slab also need to be taken into account. Other paradigms on which data have recently been released are four bridges in Japan and one in the Czech Republic. Their excessive deflections can also be explained. The detailed method of analysis and the lessons learned are presented in Part Ⅱ.
机译:帕劳的Koror-Babeldaob(KB)桥的分段预应力混凝土箱梁跨度为241 m(791 ft),创下了纪录,由于过度的数十年挠度,导致了一种显着的使用寿命损失范式。分析所需的数据最近已发布,并在此处被利用以显示如何改进分析和设计。该梁在1977年分段竖立,与设计弯度相比,中跨挠度为1.61 m(5.3 ft),在经过3个月的延迟后由于补救性预应力而在1996年坍塌。与三维分析相比,传统的箱梁挠度梁式分析的误差高达20%,尽管与KB桥相比,具有更高箱宽跨度比的桥可能会有更大的误差。但是,即使是具有逐步时间积分的三维有限元分析,也无法解释当前的美国混凝土研究所,日本土木工程师学会,Comite Euro-International du Beton(或Comite Euro-International du Beton)所观测到的变形。 -Federation internationale de la precontrainte)以及Gardner和Lockman预测模型的蠕变和收缩率。这些模型给出的18年挠度估计值比实测值低50-77%,并且产生不真实的挠度历史形状。他们还预测18年的预应力损失比测得的平均预应力损失(50%)低46-56%。模型B3是唯一基于理论的模型,使用默认参数值时,其18年挠度低估了42%,预应力损失为40%。但是,在Model B3中,几个输入参数是可调整的,如果根据Brooks的长期实验室测试对其进行了调整,则会获得所有测量值的紧密拟合。对于早期挠度及其外推,重要的是模型B3可以真实地捕获由横截面壁厚的差异引起的收缩率和干燥蠕变率的差异。还需要考虑温度差异和顶部平板可能的开裂。最近发布数据的其他范例是日本的四座桥梁和捷克共和国的一座桥梁。它们的过度偏转也可以得到解释。第二部分介绍了详细的分析方法和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号