...
首页> 外文期刊>Journal of the Railway & Canal Historical Society >Samuel Telford Button. Railway signal engineer of Worcester
【24h】

Samuel Telford Button. Railway signal engineer of Worcester

机译:塞缪尔·特尔福德·巴顿。伍斯特铁路信号工程师

获取原文
获取原文并翻译 | 示例
           

摘要

From 1860 rapid strides were made in train control through the introduction of centralising signal and point control in cabins. Combined with absolute block working and interlocking this materially improved railway safety but railway companies were slow to adopt it on cost grounds. Nevertheless signal engineering companies grew rapidly and vied to improve and patent systems.
机译:从1860年开始,通过在车厢中引入集中信号和点控制,在列车控制方面取得了长足的进步。结合绝对的砌块工作和联锁功能,这极大地提高了铁路安全性,但铁路公司出于成本考虑而采用它的速度很慢。然而,信号工程公司迅速发展,并争相改进和申请专利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号