...
首页> 外文期刊>Journal International Association on Electricity Generation, Transmission and Distribution >GOVERNMENT TARGETS AT ADDING 1,190MW OF HYDROPOWER CAPACITY IN 2019
【24h】

GOVERNMENT TARGETS AT ADDING 1,190MW OF HYDROPOWER CAPACITY IN 2019

机译:2019年政府目标增加水电容量1,190兆瓦

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

India aims at adding 1,190 MW of hydropower capacity in the current year, which will take the total capacity to more than 50,000 MW. India has 45,399 MW of large hydel plants and 4,594 MW of small ones. This year, central sector NEEPCO aims at adding the highest capacity of 600 MW at Kameng Hydel Power project in Arunachal Pradesh. The government of Himachal Pradesh will be adding another 211 MW in the state. These would include three units of 33.33 MW by state government-owned BVPCL and three units of 37 MW by Himachal Pradesh Power Corporation NSE -1.92 % Ltd.
机译:印度计划今年增加水电容量1,190兆瓦,这将使总容量超过50,000兆瓦。印度拥有45,399兆瓦的大型Hydel电厂和4,594 MW的小型电厂。今年,中央部门NEEPCO的目标是在阿鲁纳恰尔邦的Kameng Hydel Power项目中增加最高容量600 MW。喜马al尔邦政府将在该州再增加211兆瓦。其中包括由州政府拥有的BVPCL的三台33.33 MW机组和由喜马al尔邦电力公司NSE -1.92%Ltd的三台37 MW机组。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号