...
首页> 外文期刊>Journal of Infrastructure Systems >Closure to 'Productivity Study of Microtunneling Pipe Installation Using Simulation' by Roy Yu Luo and Mohammad Najafi
【24h】

Closure to 'Productivity Study of Microtunneling Pipe Installation Using Simulation' by Roy Yu Luo and Mohammad Najafi

机译:Roy Yu Luo和Mohammad Najafi的“使用模拟研究微隧道管的生产率研究”的结语

获取原文
获取原文并翻译 | 示例
           

摘要

We would like to thank the discussers for their efforts in improving the paper and pointing out the several issues raised. We also hope that this discussion can stimulate more research on this topic.
机译:我们要感谢讨论者在改进本文并指出提出的几个问题方面所做的努力。我们也希望这种讨论可以激发有关该主题的更多研究。

著录项

  • 来源
    《Journal of Infrastructure Systems》 |2009年第2期|135-136|共2页
  • 作者

    Roy Yu Luo; Mohammad Najafi;

  • 作者单位

    Estimator/Timberline Application Specialist, CH2M Hill, 2547 Asher View Ct., Raleigh, NC 27606;

    Center for Underground Infrastructure Research and Education (CUIRE), Dept. of Civil Engineer ing, The Univ. of Texas at Arlington, 428 Nedderman Hall, Arlington, TX 76019-0308;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号