Construction Productivity Advancement Research (CPAR) Program. Guidelines forTrenchless Technology: Cured-in-Place Pipe (CIPP), Fold-and-Formed Pipe (FFP), Mini-Horizontal Directional Drilling (Mini-HDD), and Microtunneling

机译:建筑生产力进步研究(CpaR)计划。非开挖技术指南:现场固化管(CIpp),折叠成型管(FFp),微型水平定向钻(mini-HDD)和微通道

获取原文

摘要

These guidelines mark the completion of the Construction Productivity AdvancementResearch (CPAR) project 'Trenchless Construction: Evaluation of Methods and Materials to Install and Rehabilitate Underground Utilities.' CPAR is a cost-shared U.S. Army Corps of Engineers and construction industry research program. This 3-year project was conducted by the U.S. Army Engineer Waterways Experiment Station and the Trenchless Technology Center at Louisiana Tech University. The overall objective of this study was to develop guidelines that owners, engineers, and contractors could use to evaluate and select appropriate trenchless methods and equipment for their project requirements and site conditions. The guidelines focus on the three major elements of trenchless technology investigated in this study: rehabilitation of existing pipelines using cured-in-place (CIPP) and fold-

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号