...
首页> 外文期刊>Journal of Infrastructure Systems >PPP Social Infrastructure Procurement: Examining the Feasibility of a Lifecycle Performance Measurement Framework
【24h】

PPP Social Infrastructure Procurement: Examining the Feasibility of a Lifecycle Performance Measurement Framework

机译:PPP社会基础设施采购:审查生命周期绩效评估框架的可行性

获取原文
获取原文并翻译 | 示例
           

摘要

Public-private partnerships (PPPs) have been extensively used to deliver an array of infrastructure projects in Australia; they have become an integral part of several state governments' procurement strategies. Over the last decade, however, several major PPP projects have incurred significant cost and schedule overruns, which have marred their use as a mechanism for delivering much-needed infrastructure. The paucity of performance measurement frameworks has contributed to the difficulty of proactively managing the effective and efficient delivery of PPPs, particularly during operations and maintenance. With this in mind, a lifecycle and stakeholder-oriented performance measurement framework (PMF) is conceptualized within the context of social infrastructure PPPs. The opinions of 160 practitioners about the proposed measures and their core indicators were solicited using a questionnaire survey. Confirmatory factor analysis was used to test the significance of proposed measures and their relevant core indicators (CIs) for measuring the performance of PPP projects throughout their lifecycle. The analysis reveals that the proposed PMF is a reliable and robust tool that can be used to assist with ensuring that social infrastructure PPPs can be delivered successfully throughout each phase of their lifecycle. The developed PMF provides governments and private consortiums with a robust and practical tool to measure and control the performance of their future projects.
机译:公私伙伴关系(PPP)已被广泛用于在澳大利亚实施一系列基础设施项目;它们已成为几个州政府采购策略的组成部分。但是,在过去的十年中,几个大型的PPP项目产生了巨大的成本和进度超支,这损害了它们作为提供急需的基础架构的机制的用途。绩效衡量框架的匮乏导致难以主动管理PPP的有效交付,特别是在运营和维护过程中。考虑到这一点,在社会基础设施PPP的背景下概念化了生命周期和面向利益相关者的绩效评估框架(PMF)。通过问卷调查征求了160名从业者对拟议措施及其核心指标的意见。验证性因素分析用于检验拟议措施及其相关核心指标(CI)的重要性,以衡量PPP项目在其整个生命周期中的绩效。分析表明,拟议的PMF是可靠而强大的工具,可用于帮助确保社会基础设施PPP在其生命周期的每个阶段都能成功交付。已开发的PMF为政府和私人财团提供了强大而实用的工具,可用来衡量和控制其未来项目的绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号